How We Deliver

Six phases. Zero surprises.

Building — or remodeling — a home should be exciting, not stressful. Our process was designed over 24 years to remove the two things clients fear most: uncertainty about cost, and uncertainty about time. It scales from a single renovation to an entire subdivision.

0%
Projects On Time
Weekly
Progress Reports
1
Accountable Team
0yr
Structural Warranty
The Chanan Method

From first conversation to keys in hand.

01

Discovery

2–4 weeks

We begin by listening. How do you live? What does home mean to you? We walk your land (or help you find it), study light, slope, and views, and establish a realistic budget envelope before a single line is drawn.

02

Design

2–4 months

Working with our architects — or yours — we develop the home through sketches, 3D models, and walkthroughs. You'll see and approve every room before it exists. Design ends with a complete set of documents and a fixed materials palette.

03

Pre-Construction

4–8 weeks

The unglamorous phase that makes everything else go smoothly: permits, engineering, final pricing, and scheduling. You receive a guaranteed budget and a milestone calendar — the plan we will actually keep.

04

Construction

10–16 months

Foundation, frame, envelope, systems. Your project lead sends a photo-and-progress report every week, and you're invited to scheduled site walks at every major milestone. Third-party inspections verify what the eye can't see.

05

Detailing & Finish

3–5 months

Where a house becomes a Chanan home. Master tradespeople execute the millwork, stone, plaster, and metalwork — and our finish supervisor walks every room with a punch list measured in millimeters.

06

Handover & Aftercare

Ongoing

We hand you the keys, a complete home manual, and a two-year aftercare program with scheduled check-ins at 90 days and one year. Our ten-year structural warranty stands behind everything else.

Construction site with crane at sunrise
Efficiency, Engineered

Why we finish on time when others don't.

On-time delivery isn't luck — it's logistics. We run construction the way great firms run any complex project:

  • Materials ordered and staged months ahead of installation
  • The same proven crews, scheduled before ground breaks
  • Decisions locked in design — not improvised mid-build
  • A live schedule you can see, updated weekly
The weekly reports meant we never once had to call and ask what was happening. In fourteen months, there was not a single surprise.
Private Client · Hillside Residence, 2024
Craftsman at work framing a home
The Promise

Your budget, guaranteed. Your timeline, kept.

Since 2002, that promise has been the reason our clients recommend us to the people they care about.